Mashhad Urban Railway Corporation, Line 1
- Daily transportation capacity : up to 170 million passengers in 16-hour operation
- Equivalent to 15.5 km tunnel, 8.5 km interchange
- Operational: 19.5 km with 22 stations
- Path length: 24 km with 24 stations
- 13 Subway stations, 11 interchange stations
Mashhad Urban Railway Line 1 Development:
It is developing along the line 1.
Path length: 4.5 km
Number of stations: 2 stations (flight and airport)
Structure features of the route: shallow underground tunnel

Mashhad Urban Railway Corporation, Line 1
- Daily transportation capacity : up to 170 million passengers in 16-hour operation
- Equivalent to 15.5 km tunnel, 8.5 km interchange
- Operational: 19.5 km with 22 stations
- Path length: 24 km with 24 stations
- 13 Subway stations, 11 interchange stations
Mashhad Urban Railway Line 1 Development:
It is developing along the line 1.
Path length: 4.5 km
Number of stations: 2 stations (flight and airport)
Structure features of the route: shallow underground tunnel
