English (United States) فارسى (ايران)

Line 1
Mashhad Urban Railway Corporation, Line 1
  • Daily transportation capacity : up to 170 million passengers in 16-hour operation
  • Equivalent to 15.5 km tunnel, 8.5 km interchange
  • Operational: 19.5 km with 22 stations
  • Path length: 24 km with 24 stations
  • 13 Subway stations, 11 interchange stations
Mashhad Urban Railway Line 1 Development:

It is developing along the line 1.

Path length: 4.5 km

Number of stations: 2 stations (flight and airport)

Structure features of the route: shallow underground tunnel

 

Mashhad Urban Railway Corporation, Line 1
  • Daily transportation capacity : up to 170 million passengers in 16-hour operation
  • Equivalent to 15.5 km tunnel, 8.5 km interchange
  • Operational: 19.5 km with 22 stations
  • Path length: 24 km with 24 stations
  • 13 Subway stations, 11 interchange stations
Mashhad Urban Railway Line 1 Development:

It is developing along the line 1.

Path length: 4.5 km

Number of stations: 2 stations (flight and airport)

Structure features of the route: shallow underground tunnel

 

Copyright 2009 by Murco Corporation